Guide · Facilities managers · 3 min read · Updated 17 November 2026

Standby Generator Installation Moves: What Happens

Short answer

A standby generator installation move starts with a site survey and a lift and rigging plan. The old set is disconnected by an electrician, drained and removed, then the new set is lifted from the lorry and moved to its plinth by crane, skates or a gantry, depending on the route. Rigging and skating starts from £1,500, with crane lifts £600–£1,800 on top where needed.

Standby Generator Installation Moves: What Happens

Who this applies to

Standby generators protect hospitals, care homes, data centres, offices, farms and factories against power cuts. When a set is replaced or a new one installed, getting it into position is often harder than buying it. Plant rooms sit in basements, behind narrow corridors, on rooftops or in courtyards that a lorry cannot reach.

These moves are planned projects, not deliveries. They involve the generator supplier, the electrical contractor, the building's facilities team and the rigging crew. This guide explains each stage so you know what to expect and what you need to organise.

Stage 1: survey and planning

A rigger surveys the whole route from the road to the plinth. They measure doorways, corridors, ramps and turns, check floor loadings and stairs, identify lifting points and note obstacles such as pipework, sprinklers and ceiling heights. If the set must go through a wall or window opening, they note that too.

From the survey comes a method statement and lift plan setting out the equipment, crew, sequence and safety controls. This is when the price is fixed, because the route decides almost everything else.

  • Route measurements, including the tightest turn
  • Floor loadings for skating heavy sets indoors
  • Lifting points, beams and anchor options
  • Protection needed for floors, walls and finishes
  • Access times and building restrictions

Stage 2: removing the old set

Your electrician isolates and disconnects the old generator. Fuel is drained from the base tank and pipework, and batteries and fluids are removed as needed for safe handling. The rigging crew then reverses the route: jacking the set up, placing it on skates, moving it out and lifting it onto the vehicle.

Old sets can be sold, returned to a dealer or scrapped. Fuel, oil, coolant and batteries need disposing of correctly as waste, so agree who is responsible for that before the work starts.

Stage 3: getting the new set in

The new set arrives on a HIAB lorry or flatbed. If the plinth is outside and close to the road, a HIAB or mobile crane places it directly. If the set must go indoors or underground, it is landed at the entrance and moved the rest of the way by riggers using hydraulic jacks, machine skates, rollers and winches. For lifts down light wells or through roof openings, a gantry or mobile crane is used.

Floors are protected with boards or plates, and the set is moved slowly with constant checks on clearances. Final positioning on the plinth is done to millimetres, so the set sits on its anti-vibration mounts as designed.

SituationTypical methodGuide price
Outdoor plinth near roadHIAB lorry£350–£1,200
Courtyard or roof positionMobile crane lift£600–£1,800
Basement or internal plant roomRigging and skatingfrom £1,500
Containerised set to siteFlatbed haulage plus cranefrom £900 plus crane

Stage 4: handover and commissioning

Once the set is in place, the riggers remove their equipment and protection, and hand over to the electrical contractor. Connection, fuel supply, exhaust and controls are then completed, and the supplier commissions the set and runs load tests. The rigging crew does not usually need to return unless something has to be repositioned.

Keep the supplier's installation instructions, and make sure the commissioning records and maintenance schedule are filed with the building's records.

Before the riggers leave, walk the route with them and check for any marks on floors, walls or door frames. Agree anything that needs making good there and then. Photographs taken before the move make this conversation quick and fair for everyone involved.

Keeping the building running

Replacing a standby generator leaves the building without backup until the new set is commissioned. Critical sites often hire a temporary generator for the changeover period, connected by the electrician to keep essential circuits protected. We can deliver and remove the temporary set alongside the main move, timing it to reduce the time without cover. Work in occupied buildings is planned around access times, noise limits and fire routes.

What can go wrong, and how planning prevents it

The most common problem on installation moves is a route that looked fine on drawings but is not as built. A doorway may be narrower once frames are fitted, a corridor may have a new fire door, or a ceiling may have dropped to make room for ducting. A proper survey of the actual route catches these before the set arrives.

Floor strength is the next risk. A heavy set on skates concentrates its weight on small points, which can crack screeds or overload suspended floors. Riggers spread the load with steel plates and boards, and a structural engineer may need to confirm the floor can take it.

Finally, timing. If the electrician, the supplier and the riggers are booked on different days, the building may be left without backup longer than needed. A single programme agreed by everyone avoids that.

  • Survey the route as built, not just the drawings
  • Confirm floor loadings for heavy sets
  • Agree one programme with all trades
  • Arrange temporary cover for critical sites

Questions people also ask

How long does it take to replace a standby generator?

The physical move often takes a day, sometimes two for complex internal routes. The full project, from survey to commissioning, usually spans several weeks because of planning, equipment lead times and electrical work. Critical sites often use a temporary generator during the changeover.

What is machine skating?

Machine skating means moving heavy equipment on low-profile roller skates placed under the base, pushed or winched along a prepared floor. It allows generators and plant to travel through doors and corridors where no crane or forklift can reach, and is controlled very slowly by trained riggers.

Do I need a survey before a generator installation move?

Yes, for any move into a plant room, basement, roof or tight courtyard. The survey checks the route, floor loadings and lifting options and allows a proper lift plan and fixed price. Simple outdoor deliveries close to the road can often be quoted from photos and measurements.

Written and checked by the Generator Transport team. Read our editorial policy.