Generator Transport glossary
The terms you'll come across, explained in plain English.
- Appointed person
- Under BS 7121, the competent person responsible for planning a crane lift and ensuring it is carried out safely according to that plan.
- Bunded base tank
- A fuel tank built into the generator's base with a second skin or bund that contains any leaks, reducing the risk of fuel escaping into the ground.
- Canopied generator
- A generator set housed in a weatherproof, sound-reducing enclosure, usually with access doors and lifting points, suitable for outdoor use on sites and events.
- Changeover switch
- Switchgear that transfers a building's supply between the mains and the generator, so the set cannot back-feed into the public network.
- Containerised generator
- A large generator built into a shipping-container-style acoustic enclosure, often 20ft or 40ft, moved by flatbed and lifted by mobile crane.
- Contract lift
- An arrangement where the crane company plans, manages and takes responsibility for the lift, rather than simply supplying a crane and operator.
- HIAB
- Common trade name for a lorry-loader crane, a hydraulic crane mounted on a rigid lorry that lets one vehicle carry and lift a load into place.
- kVA
- Kilovolt-amperes, the usual unit for a generator's apparent power output. It gives a rough guide to the size and weight of the set and the vehicle needed to move it.
- Lift plan
- A written plan prepared by a competent person setting out how a lift will be carried out, including the equipment, crew, sequence and safety controls.
- Load chart
- The crane manufacturer's table showing the safe working load at each radius and boom configuration. Capacity falls as the radius increases.
- Machine skates
- Low-profile roller units placed under heavy equipment so it can be pushed or winched across a floor, used for moving generators into plant rooms.
- Mobile crane
- A self-propelled crane, usually with a telescopic boom, brought to site for heavier or longer-reach lifts than a lorry-mounted crane can manage.
- Outriggers
- Extending legs on a crane or HIAB lorry that spread the load to the ground for stability. They need firm ground and sometimes pads or mats beneath.
- Step frame trailer
- A trailer with a lower deck behind the neck, giving extra height clearance for tall loads such as containerised generators.
- Thorough examination
- A detailed inspection of lifting equipment by a competent person at set intervals under the Lifting Operations and Lifting Equipment Regulations 1998.